Machine Manufacturer, Model and Serial Number
Record the manufacturer, model and serial number from the machine nameplate or controlled records. Add the build details and affected assembly location where available.

Send Lancing the machine make, model, serial number, part or assembly reference, revision and fault details for a packaging machine spares enquiry.
Start with the machine make, model and serial number, part or assembly markings and revision.
Include relevant drawings or photographs, verified dimensions and the fault or replacement needed. Mark uncertain details so they can be checked before a route is agreed.
Identify packaging-machine spares by machine model, serial number, part number, drawing or revision, interfaces and the function affected. Compare original, engineered and repair routes using verified dimensions and records. Share the conditions around planned replacement of identified packaging-machine wear, change or service parts so the first response can focus on the right technical questions.
Ask about a spare part

01494 623015
sales@
Lancing Ltd · Company 12778496
Registered office: Department 133, 5 High Street, Maidenhead SL6 1JN, United Kingdom
Record the manufacturer, model and serial number from the machine nameplate or controlled records. Add the build details and affected assembly location where available.
Provide the part or assembly number, drawing reference and installed revision. Include clear photographs of markings and any documented supersession; distinguish an assembly reference from a component number.
Separate verified drawing dimensions, materials, finish, tolerances and ratings from measurements of a worn sample. Mark unknown values instead of treating the damaged part as the original specification.
List the mechanical, electrical, pneumatic and software interfaces relevant to the part. Include the connection, supply, signal or configuration details that the replacement must satisfy, where applicable.
Describe the fault, production urgency, consequence of failure and whether the original part is available. State whether the enquiry concerns original supply, repair, refurbishment or an engineered alternative; availability and lead time still need confirmation.
State who will install and assess the replacement and which affected-function or safety checks are required. Retain the fitted part reference, revision, test outcome and approved change record.